Advice on Rail infrastructure Projects:
High Speed, Commuter, Regional Rail, Metro, LRT

Feasibility Study, Concept Design, Preliminary Design to Tender Document and Bid process, Final Design, Permanent Way
Rail Alignment Geometry, Design Criteria, Track Work and Cost Estimate
Journey Time and Rolling Stock Fleet Calculation
For more info , Click on below links
Germany , Dubai and Abu Dhabi
Germany
Dubai
Abu Dhabi
Cologne-Frankfurt Speed V= 300 km/h , length: 180 km
Berlin – Hannover Speed V=250 km /h , length: 256 km
Berlin – Magdeburg, 160 km/h , length: 141 km
Berlin – Dresden, 160 km/h , length: 174 km
Berlin – Hamburg Speed V= 230 km/h, length: 286 km
High Speed Rail Stuttgart 21
Metro Berlin North Ring, Inner ring railway line, Frohnau – Hohen Neuendorf, 3 km, 2 Station
Metro Berlin S-Bahn line 21, Berlin-Lehrter Bahnhof (Berlin Railway Main Statioin) 3 km, 3 Station
Metro Berlin Underground line U5, section Reichstag – Berlin Rathaus
Metro Berlin
S-Bahn
Abu Dhabi Metro Project: RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design, PE-Design, Tender Documents, over 130 km Feasibility Study, 20 km and 12 Stations PE
Abu Dhabi LRT Project: RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design, PE-Design, Tender Documents, , over 300 km Feasibility Study, 50 km and 70 Stations PE
Abu Dhabi Regional Rail Project : RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design , over 400 km Feasibility Study
Abu Dhabi PMC: RFP, Tender Process for Consultancy Services, Evaluation and interview with bidders
Abu Dhabi Hyperloop Project: Feasibility Study
Abu Dhabi Metro Project: RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design, PE-Design, Tender Documents, over 130 km Feasibility Study, 20 km and 12 Stations PE
Abu Dhabi LRT Project: RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design, PE-Design, Tender Documents, , over 300 km Feasibility Study, 50 km and 70 Stations PE
Abu Dhabi Regional Rail Project : RFP, Tender Process for Consultancy Services, Feasibility Study, Concept Design , over 400 km Feasibility Study
Abu Dhabi PMC: RFP, Tender Process for Consultancy Services, Evaluation and interview with bidders
Abu Dhabi Hyperloop Project: Feasibility Study
2009 – 2020
For more info about me
👇️Click on below menu 👇️

Advice on Rail infrastructure Projects:
High Speed, Commuter, Regional Rail, Metro, LRT
Feasibility Study, Concept Design, Preliminary Design to Tender Document and Bid process, Final Design, Permanent Way
Rail Alignment Geometry, Design Criteria, Track Work and Cost Estimate
Journey Time and Rolling Stock Fleet Calculation